ONGOING PROJECTS. Kahalgaon II(Bihar) Sipat II (CG) Sipat I (CG) Barh (Bihar) Korba III (CG) Dadri II (UP) Bhilai Exp (CG) Farakka III (WB) Simhadri II (Ap) Vallur (TN) Aravali (HR) Manda(MH) Koldam Hydro(HP) Loharinag Pala Hydro(UKD) Tapovan Vishnugad Hydro(UKD) | MW(Megawatts). 1000 500 1980 1980 500 980 500 500 1000 1000 1500 1000 800 600 520 |
Sunday, September 20, 2009
Ongoing Projects of NTPC
Apart from hydro projects,most of thermal projects are made up of unit sizes of 500 MW and 660 MW.Already 1240MW has been added to its installed capacity in the Eleventh Plan.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment